---
updatedAt: 2026-11-05T04:04:46.000Z
agentTools:
  projectIndex: https://developer.runn.io/llms.txt
---

# FAQ

*Getting started*

**Is there an OpenAPI specification for the Runn API?**<br />Yes - All Runn API v1 endpoints are available via an [OpenAPI v3.1 specification](https://developer.runn.io/openapi/v1.0.0.json).

**I’m getting a 404 Not Found error — what does that mean?** A 404 usually means you’re using the wrong API base URL. Check Settings → API in the Runn app to confirm the correct URL.

**My API request stopped working. Why?**

The most common causes are :

* API rate limits being exceeded [Learn more](rate-limits)
* An expired API token (Check Settings > API)

<br />

*Limits & constraints*

**Can I delete projects or clients via the API ?**<br />No. Deleting projects or clients isn’t supported via the API due to cascading data impacts. Use the Runn web app instead.

**Can I delete people via the API?**<br />Yes - with restrictions. Deletion will fail if the person has existing assignments or actuals, unless you use the [force flag](../reference/delete_people-personid).

<br />

*Assignments*

**Can I split an assignment into multiple date ranges via the API?**<br />No. The API doesn’t support splitting assignments. You’ll need to delete the assignment and recreate the required segments. If you sync assignments from another system, see [Syncing from another system](syncing-data).

**Can assignments have different hours on different days?**<br />No. Assignments use a constant number of hours per day.

If you need:

* 8 hours on day one
* 2 hours on day two

Create two separate assignments.

**Why does an assignment appear in the API but not in the app?**<br />Single-day assignments that fall on a public holiday are hidden in the UI. They’re retained in case the public holiday is later removed or changed.

<br />

*People & contracts*

**How do I get a person's current role?**<br />A person's role is defined in their active [contract](https://developer.runn.io/reference/get_people-personid-contracts-current).

**Can I update costs or roles from a specific date?**<br />Yes. [Create a new contract](../reference/post_people-personid-contracts) with a startDate matching when the change should apply.

<br />

*Actuals & time tracking*

**Our time sheets live in another system. How do we import them?**<br />See the [Actuals Guide](actuals-notes) for supported import methods.

**What is the best way to fetch all updated actuals?**

Use the modifiedAfter query parameter along with cursor-based pagination.

**High-level process**:

1. Page through all results using cursor
2. Track the latest updatedAt value
3. Repeat future requests using modifiedAfter

For full details, see the [Actuals guide](actuals-notes).

**If records change while paging, will they appear automatically?**

No. Updates aren’t guaranteed to appear in later pages.

You’ll need to:

* Make a new request using modifiedAfter
* Omit the cursor parameter

**Can I set the time off type when creating time off?**<br />Yes. Refer to the [Time offs Endpoint Guide](time-offs-1) for supported types and behaviours.

<br />

*Reporting & calculations*

**Can I extract report metrics of my projects and people via the API?**

You can get by-day entries of assignments and actuals for a project or person using our reports endpoints [here.](https://developer.runn.io/reference/get_reports-hours-projects-projectid)

If you would like to extract other metrics from Runn, you can calculate the metrics using the raw data available through the API.

For example, if you're looking to calculate utilization, you would need to:

* Retrieve a person's contract details and their contract hours.
* Retrieve that person's time offs.
* Retrieve that person's assignments.
* Calculate the Effective Capacity by deducting the time off minutes from the contract minutes. Then compare the effective capacity minutes with the assigned minutes for the relevant dates to calculate the utilization percentage.

We outline how metrics are calculated [here](https://help.runn.io/en/articles/10356662-runn-metrics-glossary), in our help documentation. As long as your team can retrieve the relevant raw data from the API, you can replicate the calculations.

*Integrations*

**Do you have an MCP (Model Context Protocol) server?**<br />Not directly, but you can use a subset of the API endpoints exposed through [Zapier Integrations](https://zapier.com/apps/runn/integrations) with [Zapier MCP](https://zapier.com/mcp).

<br />